Black & Veatch, Coalition Donate Electric Resiliency to Hurricane-Affected Puerto Rico School, Saving it in the Process A coalition led by Black & Veatch donated tens of thousands of dollars in technology along with the manpower to provide a new, solar-driven power source for the SU Manuel Ortiz in Yabucoa, ground zero of Hurricane Maria.
Redevelopment and Restoration of Abandoned Industrial Site Brings Back Native Wildlife Black & Veatch partnered with the State of Delaware’s Department of Natural Resources and Environmental Control to go beyond their initial cleanup assignment to develop a solution that focuses on long-term sustainability and natural resource management for all living creatures in the Yorklyn Valley region.
New Ulu Pandan Demonstration Plant Sets the Global Standard for Water Innovation The Ulu Pandan Wastewater Treatement Demonstration Center has a treatment capacity of 12,500m3/day, and serves to test advanced water treatment technologies before deploying them on a larger scale at Tuas Water Reclamation Plant in the future.
Industrial Wastewater Treatment Keeps Power Facilities Compliant A large utility located in the Midwest needed to build a low volume wastewater (LVW) treatment system to improve to two of its coal-burning plants necessitated by the Coal Combustion Residuals (CCR) rule.
World’s Largest Nutrient Recovery Facility Produces Valuable, Environmentally Friendly Fertilizer Black & Veatch designed and built the world’s largest nutrient recovery facility at the Stickney WRP. The plant is providing an environmentally progressive solution to support the larger goal of reducing Gulf hypoxia.
Black & Veatch is EPC Contractor for the First Hydrogen Fueling Station Network in U.S. History Black & Veatch and FirstElement Fuel Inc. are working to rapidly bring hydrogen fueling stations to consumers in California who want a zero emission option for their cars. FirstElement Fuel selected Black & Veatch to engineer, permit and construct 19 hydrogen refueling stations across California.
Increasing the Water Supply Throughout California's Silicon Valley Black & Veatch was chosen as the prime consultant for the Silicon Valley Advanced Water Purification Center (SVAWPC). The project is a regional approach and cooperative effort between the Santa Clara Valley Water District and the city of San José.
Microgrid with Energy Storage System Promotes Reliability and Sustainability To help clients realize greater levels of sustainability and to ensure reliable operations, Black & Veatch constructed a microgrid to power the company’s Innovation Pavilion at its World Headquarters in Overland Park, Kansas.
Partnering with Tesla to Construct the Largest Contiguous Electric Vehicle Charging System in the World Tesla Motors manufactures the Tesla Model S, the all-electric car that won the Motor Trend 2013 Car of the Year award. While developing the car, Tesla launched a program to aggressively deploy high-power, fast-charging stations — “Superchargers” — along major travel corridors throughout the United States.
Black & Veatch is Creating a Solar Energy Future to Benefit Arizona In 2013, Black & Veatch was awarded an Engineering, Procurement and Construction (EPC) contract to design and build the 32-megawatt utility-class Gila Bend Solar Power Plant located on 400 acres in Gila Bend, Arizona.
Black & Veatch Boosts Dam’s Hydropower Capacity by 47 Percent There were two primary issues at Twin Falls dam: inadequate spillway capacity and an aging powerhouse. Both created safety issues.