Black & Veatch served as EPC contractor to provide engineering, procurement and construction services, including permitting, for the new Cassava Substation. The project involved building a new 138/69kV substation from the ground up in a remote corner of Texas. The station utilizes a three-breaker 69kV ring bus with a 138/69kV transformer and 138kV breaker. The project also built 13 miles of new 138kV overhead transmission line to replace the old existing 69kV line.