Spoiler alert: any facility that has electrical distribution equipment needs an Arc Flash Hazard Analysis. The key (and hard part) is making sure they’re done successfully, with safety driving the entire process. In this Power Tech Pod, host Becca Schmidt talks with Kevin Parish, Lead Electrical Engineer for Black & Veatch, who outlines proper steps for an analysis. Kevin discusses best practices for planning and preparation, site visits, data collection, risk mitigation and equipment labeling.