This project covers the Delaware and New Jersey portions of a major 250-mile long 500 kV electricity transmission line known at the Mid- Atlantic Power Pathway (MAPP). The project includes agency consultations; review of federal, state, and local statutes, regulations, and guidelines; identification of required permits and licenses; and preparation of environmental permit applications and supporting documentation (EIS / EA).
Download