A Dive into Commissioning of Desalination Plants

Reverse Osmosis

About this Webinar

Once systems or sub systems are turned over to second stage, commissioner will start he Load commissioning tests procedures that shall include sampling, analyzing, testing, monitoring, and records log sheet etc. the commissioner shall operate all the systems & sub-systems in both manual and automatic modes as considered on the original design.

Come and join us into an interesting conversation in which will go through tips and experiences gathered by the time worked as part of Black & Veatch commissioning team.